N
NJB LANDSCAPES
Proposal Generator
#0001
Total Proposal
$0
0 areas
25% margin
Client Details
Overall Scope of Works
This appears in the opening line of the proposal letter. Keep it short.
Default Settings
Used when adding a new area — you can override per area.
Mobilisation
This covers plant & material mobilisation, load/cart/removal of waste, tip fees, site inspections and final site clean.
Note: Mobilisation is added on top of all areas (which already include profit margin). Adjust freely per job — typical is 5–15% of total works.
Profit Margin (whole job)
25%
Applied on top of cost: Area price = Cost ÷ (1 − margin%)
Areas Summary
Full Cost Breakdown
Total labour$0
Total materials (+10% buffer)$0
Subtotal cost$0
Profit (25%)$0
Areas total$0
Mobilisation$0
TOTAL PROPOSAL$0
Preview & Copy
The proposal below is generated from your client details and areas. Tap the button to copy the full text — ready to paste into GHL.
Optional Notes
Saved ✓